[Case Study of Data Center Operation Management Solution] Large-Scale Data Center

Maximize capacity! Introducing the benefits of utilizing CFD analysis in data center operations management based on successful implementation case studies.

This is a case study of the digital twin technology "Cadence Reality DC Design/Insight (formerly 6SigmaDCX)" used for operational management of data centers while utilizing thermal flow analysis. As part of a project to integrate IT equipment, Cadence was asked to assist in improving data center operations before implementing large-scale equipment installations. This verification was essential for safely executing the project. In conducting the verification, the company created a 3D model as a digital twin of the facility before improvements. They analyzed the results to determine whether improvements were necessary in the room before implementing IT equipment in the real environment. From the company's verification, it was possible to safely carry out large-scale IT equipment integration projects based on scientific evidence, maximizing the capacity of the data center. [Results] - Demonstrated optimization of airflow and reduction of operational costs. - Implemented IT equipment layout plans based on evidence identified from the analysis, allowing for the acquisition of appropriate data in advance. *For more details, please refer to the PDF document or feel free to contact us.*

  • image_133.png
  • image_134.png
  • image_135.png
  • image_136.png
  • Other analyses

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Data Center Operations Management Solution Case Study: Citi Group

We will introduce a successful case study of implementing an operational management solution for data centers using thermal airflow analysis!

This is a case study of the implementation of digital twin technology for data center operations management using thermal airflow analysis with 'DataCenter Design/Insight' (formerly 6SigmaDCX). ■ Background of Implementation Citi Group owns a data center of 3,700 square meters. Built in 1986, this data center was unable to implement new equipment due to capacity constraints. To address this, they received a grant from the NYSERDA program "FlexTech," aimed at improving energy efficiency, and utilized the digital twin of the CFD analysis tool 'DataCenter Design/Insight.' ■ Results After Improvement The improved data center ensures 100% thermal compatibility and thermal safety for IT equipment, allowing the group to achieve its goals. Additionally, the PUE ratio improved to within 1% of the compliance range recommended by the Green Grid. *For more details, please refer to the PDF document or feel free to contact us.

  • image_138.png
  • Other analyses

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study of Data Center Operation Management Solution] Major Healthcare Company

Visualization of airflow, cooling, and power! We will introduce a successful case of data center optimization.

This is a case study of the digital twin technology "Cadence Reality DC Digital Twin," which manages data center operations using thermal flow analysis. A major healthcare company in the United States was seeking ways to effectively utilize unused capacity without compromising fault tolerance. The company was looking for a "predictive tool" that could efficiently manage power, cooling, and available space to respond to increasing power density, and due to its high confidentiality, it required a "fail-safe method" to achieve these goals. As a result, a project was initiated to revamp the traditional data center using our thermal fluid analysis (CFD) product. By migrating systems and services from colocation to its own data center, the company achieved annual cost savings of approximately $300,000 (about 40 million yen). [Case Overview] ■Scope: Design and operation of data centers, optimization, and capacity planning implementation ■Software Used: Cadence Reality DC Digital Twin *For more details, please refer to the PDF document or feel free to contact us.

  • Software (middle, driver, security, etc.)

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration